Environmental and Social Impact Assessment for
Yirgalem II – Bensa Daye 132 kV Power Transmission Subproject Final Report

Arsi Robe 132kV Substation and Transmission Line (TL) Sub-project. It highlights the purpose of the project, which is to connect electricity to the Arsi Robe Substation by tapping power from the New Asela Wind Farm Substation. This approach is both technically and financially preferable compared to alternatives like tapping from Asela Substation or LILO (Line-In Line-Out).

First Power Sector Reform Investment and Modernization in Ethiopia (PRIME-1) Project (P176731) as Part of a Multiphase Programmatic Approach

The World Bank will be supporting the Ethiopia Electric Power and Ethiopia Electric Utility in
implementing the First Power Sector Reform Investment and Modernization in Ethiopia (PRIME-1). The
Project Development Objective is to is to strengthen and expand the electricity network, enable
renewable energy generation, and support power sector reforms.

Environmental and Social Management Framework
(ESMF)

The Project Development Objective (PDO) is to strengthen and expand the electricity network and
enable renewable energy generation in Ethiopia.
PRIME-1 will cover a range of activities to meet the development objectives, while preparing for
subsequent phases of the PRIME program and pursing sector reforms and financial performance
improvement. The Project will rehabilitate the distribution network in existing grid-connected areas
across 72 key towns.

First Power Sector Reform Investment and Modernization in
Ethiopia (PRIME-1) Project (P176731) as Part of a Multiphase Programmatic Approach (MPA) Resettlement Policy Framework (RF)

The PRIME-1 and its ancillary facilities will require land acquisition, and induce restrictions on land use with temporary and/or permanent economic and physical displacement of people living in or near the proposed Project implementation target areas. The project may further result in loss of agricultural land and grazing land, loss of livelihood due to impacts on sources of earning (including wage-based on enterprise-based income), impact on natural drainage leading to land use change, or impacts on access to services or other access issues in urban areas too.

POWER SECTOR REFORM, INVESTMENT AND MODERNIZATION IN
ETHIOPIA (PRIME-1) (P176731)SECURITY RISK ASSESSMENT AND MANAGEMENT PLAN (DRAFT)

The main objective of the SRA is to identify, analyze, and rate the potential security threats to the project
workers, sites, assets, and activities as well as to project-affected communities that can arise from the
project activities, equipment, and physical infrastructure investments.

Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1) Project (P176731) Stakeholder Engagement Plan (SEP)

The PRIME Program as a Multiphase Programmatic Approach (MPA) is structured in four phases: PRIME-1, an Investment Project Financing (IPF) operation with Performance-Based Conditions (PBCs) will prioritize critical infrastructure investments and set the stage for structural and operationalreforms at the energy sector.

Environmental & Social Impact Assessment for Hawassa – Shashemene 230kV Power TL Subproject

Arsi Robe 132kV Substation and Transmission Line (TL) Sub-project. It highlights the purpose of the project, which is to connect electricity to the Arsi Robe Substation by tapping power from the New Asela Wind Farm Substation. This approach is both technically and financially preferable compared to alternatives like tapping from Asela Substation or LILO (Line-In Line-Out).

Environmental and Social Impact Assessment for Bale Robe 132 kV Power Transmission Subproject Final Report

The Bale Robe 132 kV Sub-project has been proposed to address the need to transport electricity from the Line-In-Line-Out (LILO1) point of Melka Wakena Yugo – Yado 132 kV line to Bale Robe Substation to meet the growing electricity demand of residential and industrial consumers. This Project is aligned with Ethiopia’s National Electrification Program (NEP 2.0), which envisions to achieve near-universal electrification by 2030 and the Ethiopian Electric Power’s (EEP) Electricity Sector Development Strategy/Plan (2020/21 – 2030), which provides for priority investments in generation, transmission
and interconnection as well as the distribution and network expansion over its 2020/21 – 2030 plan horizon.

Environmental & Social Impact Assessment for Arsi Robe 132kV Power Transmission Subproject

Arsi Robe 132kV Substation and Transmission Line (TL) Sub-project. It highlights the purpose of the project, which is to connect electricity to the Arsi Robe Substation by tapping power from the New Asela Wind Farm Substation. This approach is both technically and financially preferable compared to alternatives like tapping from Asela Substation or LILO (Line-In Line-Out).

Environmental & Social Impact Assessment for Durame 132kV Power Transmission Line Subproject

The Durame 132kV Power Transmission Line subproject has been proposed to address the need to transport electricity from the Line-In-Line-Out (LILO) point of the existing Alaba-Wolayta II 132kV transmission line to Durame Substation to meet the growing electricity demand of residential and industrial consumers. This subproject is aligned with Ethiopia’s National Electrification Program (NEP 2.0), which envisions achieving near-universal electrification by 2030, and the Ethiopian Electric Power’s (EEP) Electricity Sector Development Strategy/Plan (2020/21 – 2030), which provides for priority investments in generation, transmission, and interconnection, as well as the distribution and network expansion over its 2020/21 – 2030 plan horizon.

Environmental and Social Impact Assessment for Haromaya – Chelenko 132kV Power Transmission Line Project

Haromaya–Chelenko 132kV Power Transmission Line subproject, which aligns with Ethiopia’s National Electrification Program (NEP 2.0) and the Ethiopian Electric Power’s (EEP) Electricity Sector Development Strategy/Plan (2020/21–2030). These initiatives aim to achieve universal electrification by 2030 and focus on expanding the power infrastructure, including generation, transmission, and interconnection.

Issuance of Environmental Clearance for the Implementation of Haromaya–Chelenko 132kV Power Transmission Line Project

The document confirms the issuance of an Environmental Clearance for the Haromaya–Chelenko 132kV Power Transmission Line Project, to be implemented in the Oromia National Regional State. The clearance is granted based on the evaluation of the Environmental and Social Impact Assessment (ESIA) report, ensuring compliance with national environmental requirements.

Environmental & Social Impact Assessment for Woliso 230kV Power TL Project Draft Report

The Woliso 230kV Substation and Transmission Line Sub-project has been proposed to address the need to transport electricity from the LILO point of Wolkite – Sebeta 230kV line to Woliso Substation to meet the growing electricity demand of residential and industrial consumers. This Project is aligned with Ethiopia’s National Electrification Program (NEP 2.0), which envisions to achieve near-universal electrification by 203 and the Ethiopian Electric Power’s (EEP) Electricity Sector Development Strategy/Plan (2020/21 – 2030), which provides for priority investments in generation, transmission and interconnection as well as the distribution and network expansion over its 2020/21– 2030 plan horizon.

Issuance of Environmental Clearance for the Implementation of Wolkite-Sebeta 230kV Power Transmission Line to Woliso Substation Project

The Federal Democratic Republic of Ethiopia Environmental Protection Authority has granted environmental clearance for the Wolkite-Sebeta 230kV Power Transmission Line to Woliso Substation Project, to be implemented in the Oromia National Regional State. The clearance is valid for one year and follows the submission and evaluation of the Environmental and Social Impact Assessment (ESIA) report.

Environmental and Social Impact Assessment Bure – Injibara 230kV Power TL Subproject Final Report

Issuance of Environmental Clearance for the Implementation of Bure-Injibara 230kV Power Transmission Line Project

Environmental and Social Commitment Plan for Power Sector Reform, Investment and Moderation in Ethiopia

The Federal Democratic Republic of Ethiopia (the Recipient) will implement the Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1) Project (P176731) (the Project), with the involvement of the, Ethiopian Electric Power (EEP) and Ethiopian Electric Utility (EEU) as set out in the Financing Agreement. The International Development Association (the Association) has agreed to provide financing for the Project, as set out in the referred agreement.

Environmental and Social Impact Assessment Jimma II – Limmu Genet 132kV Power TL Subproject Final Report

The Jimma II – Limmu Genet 132kV Power Transmission Line Subproject is aligned with Ethiopia’s National Electrification Program (NEP 2.0), which envisions to achieve nearuniversal electrification by 2030 and the Ethiopian Electric Power’s (EEP) Electricity Sector Development Strategy/Plan (2020/21 – 2030), which provides for priority investments in generation, transmission and interconnection as well as the distribution and network expansion over its 2020/21 – 2030 plan horizon.
The Federal Democratic Republic of Ethiopia (FDRE) is planning to implement a Power Sector Reform, Investment and Modernization in Ethiopia (PRIME-1) (P176731). PRIME1 is a Multi-phase Programmatic Approach (MPA) program and will support a medium-term
transition of the electricity sector towards universal access, reliable supply, utility financial sustainability, increased private investments, and a climate-resilient diversified generation