Stakeholder Engagement Plan Jigjiga TogoWajale High Voltage Transmission
1 PROJECT OVERVIEW
1.1 Introduction
The HoA countries launched the Horn of Africa Initiative (HOAI) in 2019, recognizing the need for a concerted effort to collectively augment the development trajectory. Among the selected areas of priority is investments in development of regional infrastructure networks covering upgrading of economic corridors, energy, and digital connectivity.
SECURITY MANAGEMENT PLAN FOR 71.3KM JIGJIGA TOGO WAJAALE HIGH VOLTAGE TRANSMISSION LINE.
EXECUTIVE SUMMARY
The proposed construction of the 73.1km High Voltage (HV) Jigjiga-Tog Wajaale 400kV double circuit transmission line (‘the Project’) starting from Jigjiga substation (250877.74 m E; 1039897.48 m N) and terminating at Tog-Wajaale in the Somali region (312271.34M e E1067373.63 m N) at the border between Ethiopia and Somaliland. The transmission line crosses one Zone (Fafan), 4 Woredas and 14 Kebeles found in the Somali Regional State. The proposed Right of Way (RoW) for the transmission line will be approximately 40 metres wide.
SEA Action Plan Jigjiga Togo Wajaale High Voltage Transmission Line
1 PROJECT DESCRIPTION
1.1 Introduction
The proposed 330km high voltage transmission line traverses Oromiya, Afar, Somali and Amhara Regional States starting at a proposed substation from Bishoftu in Debre Zeit (8o44’51” N, 38o55’29” E) and terminating at Hurso sub station (9o36’46” N, 41o38’20” E).
Labour Management Procedure Jigjiga TogoWajaale High Voltage Transmission
1 PROJECT OVERVIEW
1.1 Introduction
The Horn of Africa (HOA) region has faced constant conflicts and instability, impeding infrastructure and social service development. Access to affordable and reliable energy is hindered by high costs and unreliable supply, impacting small businesses, entrepreneurships, and essential services like healthcare and education.
Environmental and Social Impact Assessment Report for 73.1 km, 400kV Extra High Voltage Jijiga-Togo Wajaale Transmission Line.
This Environmental and Social Impact Assessment (ESIA) Study Report presents an assessment of the potential environmental and social impacts and risks associated with the proposed construction of the 73.1km High Voltage (HV) Jigjiga-Tog Wajaale 400kV double circuit transmission line (‘the Project’) to ensure that environmental and social aspects are diligently considered and managed during the project lifecycle.
Traffic Management Plan for 73.1km Jigjiga-Togo Wajaale High Voltage Transmission Line
This Traffic Management Plan (TMP) sets out requirements for the management of traffic associated with the Northern and Southern Interconnectors (Ethiopia section) scope of works to optimise safe vehicular movement and transportation of people, equipment and materials. The aim of this TMP is to notify Eastern Africa Power Pool-Project Implementation Unit (EAPP-PIU), in country partner Ethiopia Electric Power-Project Implementation Unit (EEP-PIU), Ethiopian Roads Authority (ERA), project staff, subcontractors, site personnel and the local public of changes to traffic conditions and to guard against operations which may pose a hazard to traffic.